Town Homes at Brighton Mills Construction Blog


Leave a comment

Siding, Priming, Pouring

With three months of construction remaining, the Town Homes at Brighton Mills are beginning to show their final shapes and shades both outside and inside.

IMG_3110
Hardie board siding is being installed at 107 Litchfield Street town homes, while inside both 107 and 101 walls are being primed.

IMG_3117 IMG_3118   IMG_3116

Over on Holton Street, concrete slabs for the outdoor front decks have been poured.IMG_3121

Advertisements


Leave a comment

Peak Activity

There’s a little of everything on site this September from drywall, painting and priming inside the furthest along buildings to rough framing on the last building and significant site work with the construction of storm water retention systems.

Trim is being installed ahead of siding at 101 and 107 Litchfield St.IMG_3048

Meanwhile inside 101 and 107 Litchfield, walls are drywalled, taped and ready for priming to begin this week.IMG_3056

103-105 Litchfield is the last building to be framed up. Rough framing is passing the 2nd floor this week.IMG_3046

Also off Litchfield St, an extensive stormwater recharge system has been installed where the parking lot is to be built. This system will mitigate the potential environmental impact of heavy rains over impervious parking.IMG_3045