Peak Activity

Leave a comment

There’s a little of everything on site this September from drywall, painting and priming inside the furthest along buildings to rough framing on the last building and significant site work with the construction of storm water retention systems.

Trim is being installed ahead of siding at 101 and 107 Litchfield St.IMG_3048

Meanwhile inside 101 and 107 Litchfield, walls are drywalled, taped and ready for priming to begin this week.IMG_3056

103-105 Litchfield is the last building to be framed up. Rough framing is passing the 2nd floor this week.IMG_3046

Also off Litchfield St, an extensive stormwater recharge system has been installed where the parking lot is to be built. This system will mitigate the potential environmental impact of heavy rains over impervious parking.IMG_3045

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s